DAY 3: WEDNESDAY, JUNE 22, 2005
(Cropredy to Aynho Wharf)

South of Banbury begins a stretch of canal with lift bridges. Immediately south of Banbury, most of the lift bridges are left in the up position. So, there was no need to send a crew member off the boat to operate the bridge. As we got closer to Oxford, many of the bridges required lifting.

Bridge 171, between Banbury and Kings Sutton ->

IMG_1248