DAY 10: WEDNESDAY, JUNE 29, 2005
(Stockton to Warwick, bridge 46)

As we were heading for our second lock of the day, this boat (The Water Gypsy) was ready to work the lock with us. Besides conserving water, having two crews to work the locks makes the workload lighter for everyone. Given this was a flight of locks, it was worthwhile sending a couple of people ahead to prepare the next lock while others worked the current lock.

Kyle at Stockton Locks ->

IMG_1799